Example Problem:
1.
A footing of 3.6x3.6
size for a tower carries 700t load and rest on a 6 m dense sand layer overlying
by 3m clay layer. The depth of foundation foundation is 2m at 2:1 load
distribution. Liquid limit of soil is 56% and void ratio is 1.08 . The
saturated unit weight of sand and clay are 1.8 g/cc and 1.7 g/cc respectively.
i.
What is the ultimate consolidation
settlement of clay layer?
ii.
What is the Max. effective stress at
center of clay layer at the end of consolidation
Ans:
Consolidation settlement
Cc = 0.009 x (WL-10)
=
0.009 x (56-10)
=
0.414
H = 3 m
eo = 1.08
= 5.85 t/m2
For 1:2 load distribution, the change in stress stress is
It is a square footing So..
Sf= 0.187 m
2. In a laboratory the clay sample of
thickness 25mm drained at top only.50% consolidation occurs in 11 minutes.
Assume T50=0.19 T70
= 0.405.
i.
Find the time required Corresponding clay
layer in field of 3m thick and drained at top and bottom to undergo 50%
consolidation.
Ans:
H0
= 25mm ; U= 50% ; t= 11 min
T50 =0.197 ; T70 =0.405 ;
ii.The clay layer loaded for 4 years and the settlement was
found to be 50mm. The ultimate settlement expected as 300mm. Estimate the
settlement in 6 years.
Ans:
No comments:
Post a Comment